About the Project
The Head Office Building is 15yrs old and the existing Mitsubishi Electric R407c Heat Recovery VRF Systems installed when the building was built are at the end of their expected lifespan and consistently causing problems with breakdowns and refrigerant leaks on the external unit coils. We were asked to look at the 2nd Floor Systems which were not operational carrying out our surveys ‘out of hours’ and concluded that the time was right to replace and benefit from new warranty terms as well as better efficiency and lower running costs. We were tasked with carrying out these works ‘out of hours’ as well as organising a Crane lift on a Saturday morning to remove/replace the plant on the roof.
A detailed schedule of works was agreed to and all works were completed by us ahead of time, Manufacturer Commissioning took place on the agreed date and client is extremely happy with the new Touch Screen Centralised Controller we installed for them to have one point of master control over the systems.