Commercial Case Studies / Previous Work

MILK VFX, Westminster, London

Project: MILK VFX, Westminster, London
Contract Completed: 2018
Works Undertaken: Install new A/c Systems into 2x Flooors

We were tasked by one of our long-standing Main Contractors to install Daikin VRV Systems into 2x floors in Clipstone Street for MILK VFX, aswell as 2x Daikin Split Systems for the Comms Room & Heat Recovery Ventilation Units to provide fresh air into some internal offices.

Works also involved organising a Saturday AM street closure in Westminster, London for a Crane Lift for the new plant to be lifted onto the roof.  2x Internal Rooms were ‘Dark Rooms’ as such we had the Indoor Unit Cassette Fascia Panels professionally sprayed Black to blend in with the decor – a neat touch

Work was completed on schedule with Commissioning assistance provided by Ultimate Air.

         

      

Village Dental Practice, Patcham, Brighton

Project: Vilage Dental Practice, Brighton
Contract Completed: 2018
Works Undertaken: Install new A/c Systems into 3x Surgeries & Reception

Installation of Mitsubishi Cooling & Heating A/c Systems for this Dental Surgery in Brighton, client wanted minimum downtime so we sent both of our install teams to these premises on a Friday together with out electrician and got all 4x systems and electrics installed in 1x day for them

              

 

DFS – Doncaster Head Office

Project: DFS, Head Office, Doncaster
Contract Completed: 2018
Works Undertaken: Replace aged & failing Mitsubishi Electric R407c Heat Recovery VRF Systems with new Mitsubishi Electric R410a R2 Heat Recovery Systems

Following on from the works we carried out at these premises last year in 2017 we were delighted to be asked to return this year to replace the Ground Floor, First Floor & Training Wing A/c Systems.

Again all works were carried out ‘out of hours’ and by having our own engineers recently trained with the Mitsubishi Electric Monitor Tool for Commissioning we were able to self commission the systems ‘out of hours’ much to the delight of the staff.

               

Henfield Leisure Centre, Sussex

Project: Henfield Leisure Centre, Sussex
Contract Completed: 2018
Works Undertaken: Replace failed A/c Systems and Install New

We were asked to quote to replace some failed R22 A/c Systems and for the Installation of new A/c Systems into various other areas within the Leisure Centre.  We chose to quote Mitsubishi Heavy Industries Systems & were delighted to be awarded the contract.  Client is now signed up for a 5yrs 6monthly visit maintenance contract to keep the systems in perfect condition to match the 5yrs warranty we offered

                    

Davison CE High School, Worthing

Project: Davison CE High School, Worthing, West Sussex
Contract Completed: 2018
Works Undertaken: Install new A/c Systems into Hall

We were asked to quote to Install new A/c Systems into the Hall within Davison CE High School, Worthing.

We offered Panasonic Systems and were delighted to be awarded the project based on the fact that we offered the installation with an Industry Leading 7yrs warranty and we quoted the best price inclusive of all required electrical works to power the systems which our own NICEIC Approved Electrician would carry out.

Systems were installed during the early June 1/2 Term period which proved excellent timing with the long 2018 Summer Heatwave starting at the same time

Care 4 Veterans, Worthing

Project: Care 4 Veterans, Worthing, West Sussex
Contract Completed: 2018
Works Undertaken: Install new A/c Systems into Hall

We were asked to quote to Install a new A/c System into the rehab room within this premises as it became too hot in the Summer to treat patients, we recommended a Mitsubishi Twin Split Cassette System with 2x Indoor Cassette Units connected 1x Outdoor Unit

      

Ridgeworth House, Worthing

Project: Ridgeworth House, Worthing, West Sussex
Contract Completed: 2017/18
Works Undertaken: Replace 2nd Floor Systems & New Systems for 3rd Floor

We started working at Ridgeworth House back in 2010 first replacing the failed VRF system on the Ground Floor and then returning in 2011 to replace the failed VRF system on the First Floor.

This time we were asked by the landlord to re-configure the Sanyo VRF on the 2nd Floor & Install a new VRF System on the 3rd Floor.

We installed a new Mitsubishi Heavy Industries VRF system into the 3rd Floor but encountered issues with the 2nd Floor Sanyo System, it was decided with the landlord that the best course of action was to replace the Sanyo Outdoor Unit with a new Panasonic Outdoor Unit (Panasonic is the new name for Sanyo and new Panasonic VRF Outdoor Units work with old Sanyo VRF Indoor Units).

Castle Snooker Club, Brighton

Project: Castle Snooker Club, Brighton
Contract Completed: 2017
Works Undertaken: Install new A/c Systems into 2x Floors

These premises were too hot in the Summer and too cold in the Winter, the new owner of the club asked to come up with a solution to solve this issue to make the club a more comfortable environment all year round

6x Systems were installed (3 per floor) with the indoor units positioned so that airflow isn’t directly being blown onto the tables.  A full year later and Dave the owner is delighted with the end result commenting how the club is so much more comfortable all year round,  whereas patrons would previously leave in the Summer as it was too ‘stuffy’ he had no such problems during the 2018 Heatwave

    

BUPA – Tower Point, Brighton

Project: BUPA, Tower Point, Brighton
Contract Completed: 2017
Works Undertaken: Install new A/c Systems into open plan office area

We were asked to install A/c into an open plan office area with minimal ceiling void area.  We chose the Daikin 4way blow under ceiling cassette to suit this application.  Works consisted of 4x Indoor Units connected to 2x Outdoor Units.

With Tower Point being a ‘live’ building with multiple occupants all works were carried out ‘out of hours’ and our own IPAF Trained Engineers installed all pipework with the use of the largest scissor lift we could get to enter the car park.

          

DFS – Doncaster Head Office

Project: DFS, Head Office, Doncaster
Contract Completed: 2017
Works Undertaken: Replace aged & failing Mitsubishi Electric R407c Heat Recovery VRF Systems with new Mitsubishi Electric R410a R2 Heat Recovery Systems

The Head Office Building is 15yrs old and the existing Mitsubishi Electric R407c Heat Recovery VRF Systems installed when the building was built are at the end of their expected lifespan and consistently causing problems with breakdowns and refrigerant leaks on the external unit coils.  We were asked to look at the 2nd Floor Systems which were not operational carrying out our surveys ‘out of hours’ and concluded that the time was right to replace and benefit from new warranty terms as well as better efficiency and lower running costs.  We were tasked with carrying out these works ‘out of hours’ as well as organising a Crane lift on a Saturday morning to remove/replace the plant on the roof.

A detailed schedule of works was agreed to and all works were completed by us ahead of time, Manufacturer Commissioning took place on the agreed date and client is extremely happy with the new Touch Screen Centralised Controller we installed for them to have one point of master control over the systems.

Change Gym – Hove, Sussex

Project: Change Gym, Hove, Sussex
Contract Completed: 2016
Works Undertaken: Install new A/c Systems into Gymnasium

We were asked to install A/c into a Health & Fitness Gymnasium in Hove for cooling in the Summer & Heating in the Winter

We chose 4x Mitsubishi Electric Ceiling A/c Systems (2x 1way blow and 2x 4way blow) to suit the internal layout of the premises.  All work including required electrical work was carried out by Climachill Engineers

               

Small Batch Coffee – Worthing, Sussex

Project: Small Batch Coffee, Worthing, Sussex
Contract Completed: 2016
Works Undertaken: Install new A/c Systems & Toilet Extraction into Coffee Shop

We Installed 2x Samsung Black Round Flow Cassette A/c Systems into this new Coffee Shop as well as Extraction for the toilets & Pot Wash Area in the kitchen

Furniture Village – National Distribution Centrefv logo

Project: Furniture Village, National Distribution Centre, Milton Keynes
Contract Completed: 2015
Works Undertaken: The supply and installation of Air Conditioning / Heating Systems

We were asked to supply & install Air Conditioning into the offices of Furniture Village at their National Distribution Centre in Milton Keynes, our works were undertaken during ‘out of hours’ and consisted of the installation of several Mitsubishi Heavy Industries Ceiling Cassette Systems.

“I just wanted to e-mail you to pass on my thanks to the guy’s for the work that they have completed at the NDC. I have to say that this was the cleanest air con installation I have ever seen, the guy’s did a very impressive job. There were no interruptions to the day to day, the place was spotless, as if they hadn’t even been here. Very professional work gents, well done all. Regards, Max, NDC Operations Manager, Furniture Village”

     

Brighton Implant Clinic @ Worthing Dental Centre

Brighton Implant Clinic

Project: Worthing Dental Centre, Worthing, West Sussex
Contract Completed: 2014
Works Undertaken: The supply and installation of Air Conditioning / Heating Systems & Heat Recovery Fresh Air Ventilation

One of our longest served clients whom we have installed & maintained several Air Conditioning Systems throughout new dental centres he has opened over the years tasked us with our largest contract to date in 2013.  He had received planning permission to open a new ‘Super Dental Clinic’ in Worthing & due to our on-going relationship asked us to cater for the Air Conditioning / Heating requirements as well as the Building Regulations required Heat Recovery Fresh Air Ventilation System which would need to be installed.

Our brief was to work with his main contractor BHS Construction over a 10month period in transforming an old premises which hadn’t been occupied for 10yrs in Worthing town centre into a new state of the art ‘Super Dental Clinic’.  Our initial works commenced in July 2013 when we removed the old systems from the premises (in accordance with current FGas Legislation) so that the building contractor could then commence their works.  We then worked on-site at various stages over the next 10months as & when the building contractor required us – installing ventilation ductwork & all of our required pipework & cabling before ceilings could be installed, going back once ceilings were in place in order to install the duct grilles etc.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), our natural choice was to install MHI Systems throughout the premises, Climachill can offer 5 years warranty on all MHI installations, our client has signed up for an ongoing maintenance contract which will allow him to benefit from this industry leading warranty package providing 5 years of ‘worry free’ Air Conditioning,  Heating & Ventilation.

Hanover Displays

Hanover Displays LimitedProject: Hanover Displays, Lewes, East Sussex
Contract Completed: 2013
Works Undertaken: The design, supply and installation of Air Conditioning / Heating Systems & Heat Recovery Fresh Air Ventilation Systems

We have worked with Hanover Displays since 2006, initially being asked to take over the servicing of their existing Air Conditioning Systems as they felt their existing contractor wasn’t doing it properly & seemed unable to repair a system which had been faulty since they had installed it.  On our first visit we found a leak on one of the outdoor bolt connections, fixed the leak and the system has been trouble free ever since, impressed with our work we were given a maintenance contract for 6 monthly visits in order to keep their systems clean & trouble free.

When Hanover Displays planned to extend their offices in 2012/13 we were asked to install Air Conditioning / Heating Systems into the new offices.  The client had also undertaken a work productivity performance review & noticed that work productivity fell as the working day progressed, we suggested this may be as a result of ‘Sick Building Syndrome’ and in particular could be a result of high CO2 levels in the afternoon (windows were very rarely opened), the client then monitored CO2 levels and sure enough CO2 levels increased as the working day progressed.

We were then tasked with solving the increased CO2 issues and suggested that the client have Heat Recovery Fresh Air Ventilation Systems installed throughout their new offices as well as Air Conditioning / Heating Systems (the idea being that stale CO2 laden air is removed and replaced with Fresh Air).  Our brief was to install Energy Efficient Systems as they were embarking on an Energy Efficiency Drive (as part of the works all lighting for the new offices was to be LED highly efficient lighting) & they wanted us to install the most efficient systems currently on the market.

We chose to install systems from Mitsubishi Heavy Industries (MHI) as they were all A/A Energy Rated and we could offer the client an industry leading 5years warranty.

With the initial installation completed, Climachill has continued to provide site maintenance and 6monthly maintenance contract visits.

Hanover Displays now enjoy the benefits of an Energy Efficient Cooling / Heating System as well as having Heat Recovered Fresh Air being pumped throughout their new offices to keep staff in tip top condition throughout the working day.

Tempur Flagship Store @ Bluewater

Tempur LogoProject: Tempur, Bluewater Shopping Centre, Kent
Contract Completed: 2013
Works Undertaken: The design, supply and installation of Air Conditioning / Heating Systems & Heat Recovery Fresh Air Ventilation System

Tempur were opening a new Flagship Store within Bluewater Shopping Centre and we were tasked with designing / supplying & installing Air Conditioning / Heating Systems & Fresh Air Ventilation System for the new store.  Bluewater are very strict on who they let work within the site & as part of the process we had to become a ‘Bluewater Approved Contractor’.  All of our design spec for the systems we quoted were checked / verified by Bluewater Management.

We chose to install 2x Ceiling Cassette Systems from Mitsubishi Heavy Industries (MHI) as well as an MHI Heat Recovery Fresh Air Ventilation System.  As per Bluewater requirements the client has entered into 6 monthly maintenance contract with us to ensure that the systems continue to operate effectively & efficiently & all on-going maintenance works is carried out ‘out of store opening hours’.

LBS

Project: LBS, Worthing, West SussexLBSlogo
Contract Completed: 2012
Works Undertaken: The design, supply and installation of Air Conditioning Systems

Our brief was to replace the ageing R22 VRF system together with several R22 single and multi split systems for the entire office complex of this book distribution premises as part of a complete office refurbishment project.

Our solution was to install several Mitsubishi Heavy Industries single, multi split and mini VRF Air Conditioning Systems to offer energy efficient all year round comfort.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), Climachill can offer 5 years warranty on all MHI installations, LBS have signed up for an ongoing maintenance contract which will allow LBS to benefit from this industry leading warranty package providing 5 years of ‘worry free’ Air Conditioning & Heating.

BCW Gothia

gothia logoProject: Ridgeworth House, Worthing, West Sussex
Contract Completed: 2010/11
Works Undertaken: The design, supply and installation of VRF air conditioning

Our brief was to replace the non functional R22 VRF system for the ground and first floor with a modern energy efficient Air Conditioning & Heating System as part of a refurbishment project.

Our solution was to install a Samsung DVM3 system which provided a VRF solution providing 24 indoor units linked to a single outdoor unit.

With the initial installation completed, Climachill has continued to provide site maintenance and has undertaken the installation of a centralised control management system with IP access.

BCW Gothia employees now enjoy the benefits of a sophisticated Climate Control system whilst BCW Gothia themselves reap the benefits of a highly energy efficient and cost-effective system.

Greg Stone Flooring

Project: Greg Stone Flooring, Portslade, East Sussex
Greg-StoneContract Completed: 2011
Works Undertaken: The design, supply and installation of an Air Conditioning System

Our brief was to install an energy efficient heating & cooling system to the retail showroom of this flooring store to provide an all year round welcoming & comfortable environment for staff and customers.

Our solution was to install a Mitsubishi Heavy Industries R410a Hyper Inverter Ceiling Cassette System to offer energy efficient all year round comfort. We installed a wall mounted controller behind the counter area and set up a weekly schedule whereby the system will start up 30mins before the store opens, this particular feature was very much welcomed as it means during the Winter the store is nice and warm for when the premises open instead of staff having to turn on the electric heaters as they entered the store in the morning.

Air Conditioning Systems offer an extremely efficient means of providing heating compared to electric heaters during the Winter months, we calculated that due the size of the showroom and the amount of electrical heaters they were having to use to adequately heat the showroom that the ongoing electrical costs associated with the heating of the showroom would now be reduced by approx 60% which would mean the system would actually pay for itself within 3 years.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), Climachill can offer 5 years warranty on all MHI installations, Greg Stone Flooring have signed up for an ongoing maintenance contract which will allow them to benefit from this industry leading warranty package providing 5 years of ‘worry free’ Air Conditioning & Heating.