Case Study - LBS

Case Study - LBS

Project: LBS, Worthing, West Sussex
Contract Completed: 2012
Total Contract Value: £98k
Works Undertaken: The design, supply and installation of Air Conditioning Systems

Our brief was to replace the ageing R22 VRF system together with several R22 single and multi split systems for the entire office complex of this book distribution premises as part of a complete office refurbishment project.

Our solution was to install several Mitsubishi Heavy Industries single, multi split and mini VRF Air Conditioning Systems to offer energy efficient all year round comfort.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), Climachill can offer 5 years warranty on all MHI installations, LBS have signed up for an ongoing maintenance contract which will allow LBS to benefit from this industry leading warranty package providing 5 years of 'worry free' Air Conditioning & Heating.

Case Study - BCW Gothia

Case Study - BCW Gothia

Project: Ridgeworth House, Worthing, West Sussex
Contract Completed: 2011
Total Contract Value: £75k
Works Undertaken: The design, supply and installation of VRF air conditioning

Our brief was to replace the non functional R22 VRF system for the ground and first floor with a modern energy efficient Air Conditioning & Heating System as part of a refurbishment project.

Our solution was to install a Samsung DVM3 system which provided a VRF solution providing 24 indoor units linked to a single outdoor unit.

With the initial installation completed, Climachill has continued to provide site maintenance and has undertaken the installation of a centralised control management system with IP access.

BCW Gothia employees now enjoy the benefits of a sophisticated Climate Control system whilst BCW Gothia themselves reap the benefits of a highly energy efficient and cost-effective system.

Case Study - Greg Stone Flooring

Case Study - Greg Stone Flooring

Project: Greg Stone Flooring, Portslade, East Sussex
Contract Completed: 2011
Total Contract Value: £3k
Works Undertaken: The design, supply and installation of an Air Conditioning System

Our brief was to install an energy efficient heating & cooling system to the retail showroom of this flooring store to provide an all year round welcoming & comfortable environment for staff and customers.

Our solution was to install a Mitsubishi Heavy Industries R410a Hyper Inverter Ceiling Cassette System to offer energy efficient all year round comfort. We installed a wall mounted controller behind the counter area and set up a weekly schedule whereby the system will start up 30mins before the store opens, this particular feature was very much welcomed as it means during the Winter the store is nice and warm for when the premises open instead of staff having to turn on the electric heaters as they entered the store in the morning.

Air Conditioning Systems offer an extremely efficient means of providing heating compared to electric heaters during the Winter months, we calculated that due the size of the showroom and the amount of electrical heaters they were having to use to adequately heat the showroom that the ongoing electrical costs associated with the heating of the showroom would now be reduced by approx 60% which would mean the system would actually pay for itself within 3 years.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), Climachill can offer 5 years warranty on all MHI installations, Greg Stone Flooring have signed up for an ongoing maintenance contract which will allow them to benefit from this industry leading warranty package providing 5 years of 'worry free' Air Conditioning & Heating.

Climachill |  Case Studies