Case Studies

Brighton Implant Clinic @ Worthing Dental Centre

Brighton Implant Clinic

logo_FV_white_background

 

 

 

Project: Worthing Dental Centre, Worthing, West Sussex
Contract Completed: 2014
Total Contract Value: £120k
Works Undertaken: The supply and installation of Air Conditioning / Heating Systems & Heat Recovery Fresh Air Ventilation

One of our longest served clients whom we have installed & maintained several Air Conditioning Systems throughout new dental centres he has opened over the years tasked us with our largest contract to date in 2013.  He had received planning permission to open a new ‘Super Dental Clinic’ in Worthing & due to our on-going relationship asked us to cater for the Air Conditioning / Heating requirements as well as the Building Regulations required Heat Recovery Fresh Air Ventilation System which would need to be installed.

Our brief was to work with his main contractor BHS Construction over a 10month period in transforming an old premises which hadn’t been occupied for 10yrs in Worthing town centre into a new state of the art ‘Super Dental Clinic’.  Our initial works commenced in July 2013 when we removed the old systems from the premises (in accordance with current FGas Legislation) so that the building contractor could then commence their works.  We then worked on-site at various stages over the next 10months as & when the building contractor required us – installing ventilation ductwork & all of our required pipework & cabling before ceilings could be installed, going back once ceilings were in place in order to install the duct grilles etc.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), our natural choice was to install MHI Systems throughout the premises, Climachill can offer 5 years warranty on all MHI installations, our client has signed up for an ongoing maintenance contract which will allow him to benefit from this industry leading warranty package providing 5 years of ‘worry free’ Air Conditioning,  Heating & Ventilation.

Hanover Displays

Project: Hanover Displays, Lewes, East Sussex
Contract Completed: 2013
Total Contract Value: £45k
Works Undertaken: The design, supply and installation of Air Conditioning / Heating Systems & Heat Recovery Fresh Air Ventilation Systems

We have worked with Hanover Displays since 2006, initially being asked to take over the servicing of their existing Air Conditioning Systems as they felt their existing contractor wasn’t doing it properly & seemed unable to repair a system which had been faulty since they had installed it.  On our first visit we found a leak on one of the outdoor bolt connections, fixed the leak and the system has been trouble free ever since, impressed with our work we were given a maintenance contract for 6monthly visits in order to keep their systems clean & trouble free.  When Hanover Displays planned to extend their offices in 2012/13 we were asked to install Air Conditioning / Heating Systems into the new offices.  The client had also undertaken a work productivity performance review & noticed that work productivity fell as the working day progressed, we suggested this may be as a result of ‘Sick Building Syndrome’ and in particular could be a result of high CO2 levels in the afternoon (windows were very rarely opened), the client then monitored CO2 levels and sure enough CO2 levels increased as the working day progressed.  We were then tasked with solving the increased CO2 issues and suggested that the client have Heat Recovery Fresh Air Ventilation Systems installed throughout their new offices as well as Air Conditioning / Heating Systems (the idea being that stale CO2 laden air is removed and replaced with Fresh Air).  Our brief was to install Energy Efficient Systems as they were embarking on an Energy Efficiency Drive (as part of the works all lighting for the new offices was to be LED highly efficient lighting) & they wanted us to install the most efficient systems currently on the market.

We chose to install systems from Mitsubishi Heavy Industries (MHI) as they were all A/A Energy Rated and we could offer the client an industry leading 5years warranty.

With the initial installation completed, Climachill has continued to provide site maintenance and 6monthly maintenance contract visits.

Hanover Displays now enjoy the benefits of an Energy Efficient Cooling / Heating System as well as having Heat Recovered Fresh Air being pumped throughout their new offices to keep staff in tip top condition throughout the working day.

Tempur Flagship Store @ Bluewater

Project: Tempur, Bluewater Shopping Centre, Kent
Contract Completed: 2013
Total Contract Value: £15k
Works Undertaken: The design, supply and installation of Air Conditioning / Heating Systems & Heat Recovery Fresh Air Ventilation System

Tempur were opening a new Flagship Store within Bluewater Shopping Centre and we were tasked with designing / supplying & installing Air Conditioning / Heating Systems & Fresh Air Ventilation System for the new store.  Bluewater are very strict on who they let work within the site & as part of the process we had to become a ‘Bluewater Approved Contractor’.  All of our design spec for the systems we quoted were checked / verified by Bluewater Management.

We chose to install 2x Ceiling Cassette Systems from Mitsubishi Heavy Industries (MHI) as well as an MHI Heat Recovery Fresh Air Ventilation System.  As per Bluewater requirements the client has entered into 6monthly maintenance contract with us to ensure that the systems continue to operate effectively & efficiently & all on-going maintenance works is carried out ‘out of store opening hours’.

LBS

Project: LBS, Worthing, West SussexLBSlogo
Contract Completed: 2012
Total Contract Value: £98k
Works Undertaken: The design, supply and installation of Air Conditioning Systems

Our brief was to replace the ageing R22 VRF system together with several R22 single and multi split systems for the entire office complex of this book distribution premises as part of a complete office refurbishment project.

Our solution was to install several Mitsubishi Heavy Industries single, multi split and mini VRF Air Conditioning Systems to offer energy efficient all year round comfort.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), Climachill can offer 5 years warranty on all MHI installations, LBS have signed up for an ongoing maintenance contract which will allow LBS to benefit from this industry leading warranty package providing 5 years of ‘worry free’ Air Conditioning & Heating.

BCW Gothia

gothia logoProject: Ridgeworth House, Worthing, West Sussex
Contract Completed: 2011
Total Contract Value: £75k
Works Undertaken: The design, supply and installation of VRF air conditioning

Our brief was to replace the non functional R22 VRF system for the ground and first floor with a modern energy efficient Air Conditioning & Heating System as part of a refurbishment project.

Our solution was to install a Samsung DVM3 system which provided a VRF solution providing 24 indoor units linked to a single outdoor unit.

With the initial installation completed, Climachill has continued to provide site maintenance and has undertaken the installation of a centralised control management system with IP access.

BCW Gothia employees now enjoy the benefits of a sophisticated Climate Control system whilst BCW Gothia themselves reap the benefits of a highly energy efficient and cost-effective system.

Greg Stone Flooring

Project: Greg Stone Flooring, Portslade, East Sussex
Greg-StoneContract Completed: 2011
Total Contract Value: £3k
Works Undertaken: The design, supply and installation of an Air Conditioning System

Our brief was to install an energy efficient heating & cooling system to the retail showroom of this flooring store to provide an all year round welcoming & comfortable environment for staff and customers.

Our solution was to install a Mitsubishi Heavy Industries R410a Hyper Inverter Ceiling Cassette System to offer energy efficient all year round comfort. We installed a wall mounted controller behind the counter area and set up a weekly schedule whereby the system will start up 30mins before the store opens, this particular feature was very much welcomed as it means during the Winter the store is nice and warm for when the premises open instead of staff having to turn on the electric heaters as they entered the store in the morning.

Air Conditioning Systems offer an extremely efficient means of providing heating compared to electric heaters during the Winter months, we calculated that due the size of the showroom and the amount of electrical heaters they were having to use to adequately heat the showroom that the ongoing electrical costs associated with the heating of the showroom would now be reduced by approx 60% which would mean the system would actually pay for itself within 3 years.

Being an Approved Mitsubishi Heavy Industries Contractor (MHI), Climachill can offer 5 years warranty on all MHI installations, Greg Stone Flooring have signed up for an ongoing maintenance contract which will allow them to benefit from this industry leading warranty package providing 5 years of ‘worry free’ Air Conditioning & Heating.

;

;